For Clients

You want to build a house.
We'll show you how it actually works.

Eco-Bud brings engineers, panel manufacturers, and builders together into one clear process — from the first idea and sketch to a finished house.

Before you start

The question usually isn't whether you want to build a house. It's where to start.

Before construction begins, you need to make dozens of decisions: understand your budget, choose a design, a technology, and people you can trust. Most questions come up long before the first conversation with a builder.

01

Where do I even start?

I have an idea for a house — maybe even a plot already — but I don't understand the right order of steps.

02

How much will my house cost?

Price depends on more than floor area. It's shaped by the house's form, number of floors, design, materials, technology, and the country of construction.

03

How do I avoid mistakes in the design?

Decisions made at the design stage determine the cost, the structure, and much of the work that follows.

04

Who can I trust?

A good-looking website isn't enough. You want to see real production facilities, real construction sites, and houses that have actually been built.

05

Why do I need a concept design and working drawings?

It's not always clear which documents the architect, engineer, panel manufacturer, and builder each need — and at which stage.

06

How do I compare proposals?

Two different prices tell you nothing if the manufacturers and builders are pricing different houses, kit contents, or scopes of work.

Готовый жилой дом с освещённой террасой

How it works

From idea to house — in a clear sequence.

We won't promise that building a house is simple. But when each stage happens in the right order, it becomes clear what to do next and who's responsible for it.

1

Phase 1 — Understand

01

Look at real projects

Build Diary shows real construction sites — from the first stages to finished houses.

02

Understand the technology

The Technology page explains what the house is made of and how the Eco-Bud panel system works.

03

Look at manufacturers and builders

Real companies, real projects, and their track record.

Строительство дома Eco-Bud: монтаж соломенных панелей на фундаменте

Real Eco-Bud project · Build Diary

2

Phase 2 — Design

04

Tell us about your house

Country, floor area, number of floors, roof, timeline, and a budget range — this is the baseline data used to draft the project brief.

05

Concept design

If there's no finished architectural design yet, we prepare a concept design: floor plans, elevations, sections, a roof plan, and a 3D visualization. If you already have a suitable architectural design, we won't push a new concept design on you.

06

Design documentation

The engineer prepares the working drawings: panels, connection details, the assembly sequence, and specifications.

Эскизный проект: план этажа с экспликацией помещений и размерамиКонструкторская документация: развёртка стен с раскладкой соломенных панелей и спецификацией

3

Phase 3 — Choose and build

07

Comparable proposals

The principle behind the process: manufacturers and builders must price the same project using the same baseline data. Only then can the numbers be compared.

08

Choosing partners and contracts

The client selects a manufacturer and a builder and signs the corresponding contracts.

09

Manufacturing and assembly

The manufacturer produces the panel kit. The builder assembles the house shell and carries out the subsequent construction work. With a prepared foundation and a trained crew, assembling the house shell can take just a few days. The exact timeline depends on the floor area, project complexity, kit contents, and site conditions.

Монтаж дома: установка кровельных соломенных панелей на строительной площадке

4

Phase 4 — Show the result

10

The project can become part of Build Diary

With the client's consent, the construction can be published in Build Diary and help the next person see the real process.

Готовый дом с завершённой отделкой фасада и кровлей

Ready to turn your idea into a concrete project?

Архитектурные чертежи, линейки, карандаши и рука архитектора над планом дома

Design

From idea to drawings you can build from.

The concept design shows what the house will look like. The design documentation turns the architectural solution into precise data for panel manufacturing and assembly.

These are two different stages of one process — first we define the house, then we describe in detail how to manufacture and assemble it.

01

House idea

02

Concept design

03

Design documentation

04

Manufacturing and construction

Stage 1

Concept design

What will the house look like?

The concept design defines the architecture of the future house: the floor plan, exterior appearance, building massing, roof, and key spatial decisions.

01

Floor plans

The layout of rooms, walls, partitions, windows, and doors, with dimensions.

02

Elevations

The building's exterior from every side, with elevation marks and finishing materials.

03

Sections

Vertical cross-sections of the house showing floor heights and roof construction.

04

Roof plan

The shape and structure of the roof.

05

3D visualization

A visual representation of the future house in its real surroundings.

Эскизный проект: план этажа с размерами и экспликацией помещений
Эскизный проект: северный и южный фасады с высотными отметкамиЭскизный проект: восточный и главный западный фасады

Already have an architectural project?

If you already have a suitable architectural project, there's no need to start over. It can be used as the starting basis, moving straight to review and to developing the necessary design documentation.

Stage 2

Design documentation

How is it manufactured and assembled?

Once the house's architecture is defined, the engineer translates the project into a working system: determining the panels, connection details, joints, assembly sequence, and specifications.

01

Panel layout

Which panels a specific house needs, their dimensions, and their placement.

02

Structural connection details

How walls, floor structures, the roof, openings, and other elements connect.

03

Assembly drawings

How the kit is assembled on the construction site.

04

Specifications

What needs to be manufactured and prepared, and in what quantity.

Конструкторская документация: план осей дома с маркировкой и шириной каждой панели
Конструкторская документация: развёртки стен по осям А и В с раскладкой стеновых и кровельных панелейКонструкторская документация: развёртки торцевых стен по осям 1 и 2 с фронтонными панелями

Cost

Why two houses of the same floor area can cost differently.

Floor area is only one factor. Cost is shaped by the house's form, number of storeys, architecture, structural decisions, chosen materials, technologies, and scope of work.

That's why we first need to establish exactly which house we're pricing — and only then compare real proposals.

About 100 m²

House A

Дом А: одноэтажный дом простой компактной формы с двускатной кровлей и террасой

Simple, compact form

Single storey

Simple roof structure

Standard structural solutions

A reasonable number of openings

Standard finishing and design choices

Less structural complexity, fewer connection details, and a smaller scope of individual work.

About 100 m²

House B

Дом В: двухуровневый дом сложной формы с панорамным остеклением и сложной кровлей

A more complex form

Two levels or a double-height space

A more complex roof

Large openings and custom architectural solutions

More complex structural connection details

Custom finishing and design choices

The same floor area can require a different amount of materials, engineering solutions, and work.

The same floor area doesn't mean the same cost.

What else affects the cost

01

House shape

A compact rectangular shape and complex architectural geometry require a different volume of construction and work.

02

Number of storeys

A single-storey and a two-storey house of the same floor area have different structural schemes.

03

Roof

The roof's shape, spans, pitches, overhangs, and complexity affect the structure and the amount of materials.

04

Openings and architecture

The size and number of windows and doors, large openings, double-height spaces, and other decisions affect the structure.

05

Materials and finishing

The cost depends on the chosen finishing materials and the project's specific decisions.

06

Technologies and engineering solutions

Different technical and design decisions can substantially change the scope and cost of the work.

07

Country and logistics

The cost of production, labor, delivery, and related services depends on the project's region.

What exactly are we pricing?

Depending on the request, a cost estimate can cover different scopes of work. These are different quantities and cannot be compared to one another.

Panel kit

Eco-Bud panels and components manufactured for a specific project.

House shell and assembly

Assembling the house structure from the finished kit.

A broader scope of work

Additional construction, engineering, and finishing work under an agreed scope.

First, the same project. Then, compare the prices.

For manufacturers' and builders' proposals to be comparable, they must price the same house, in the same configuration, based on the same baseline data.

That's exactly why design isn't an unnecessary step before pricing. It's what makes the estimate concrete.

Project participants

One house. Several participants. Each with their own responsibility.

Design, panel manufacturing, and construction are carried out by different specialists. Eco-Bud Platform helps structure the process so that each participant works on their part of the project and understands the baseline data.

You retain control over decisions and understand who is responsible for each stage.

Your project

One set of baseline data that every project participant works from.

01

Client

What stays with you?

You define the brief, budget, and priorities, provide the baseline data, and make the key decisions about your house.

Describe the house you want to build

Provide any existing materials on the site and project

Approve design decisions

Review proposals

Choose contractors

Sign the corresponding contracts

02

Eco-Bud Platform

How does the platform help?

Eco-Bud Platform helps you move from the initial brief to the right specialists, manufacturing, and construction in a clear sequence.

Explains the sequence of the process

Helps identify what data is needed at the next stage

Connects the client with the right Eco-Bud participants

Lets you explore the technology and real projects

Helps establish a single set of baseline data for further work

03

Architect / engineer

Who turns the idea into a project?

The architect develops the house's architectural solution. The engineer prepares the design documentation needed to manufacture and assemble the elements.

Architect — floor plan, elevations, sections, roof, architectural solution

Engineer — panels, structural connection details, assembly solutions, specifications

04

Manufacturer

Who manufactures the kit?

The manufacturer produces the panel kit and other agreed elements according to the design documentation, and is responsible for the quality of its own production and for completing the order.

Receives the design documentation

Manufactures the panels

Controls production quality

Completes the order

Arranges handover or shipping under the agreed terms

05

Builder

Who assembles and builds?

The builder assembles the structure and carries out the agreed scope of construction work on site.

Preparation for assembly

Assembling the kit

Carrying out the agreed construction work

Working from the design documentation

One agreed project becomes the shared reference point for the client, engineer, manufacturer, and builder.

Who is responsible for the result of their work

Each participant is responsible for the scope of their own work agreed with the client, within the corresponding arrangements and contracts.

Manufacturing and construction work can be formalized as separate contracts with the corresponding contractors.

Comparing proposals

Two prices don't tell you anything yet if they were calculated for different things.

For manufacturers' and builders' proposals to be comparable, everyone needs the same baseline data: one project, one configuration, and one agreed scope of work.

Otherwise, a lower price may not mean a better deal — it may simply mean a smaller scope of included work.

Situation A

Without a shared project

Everyone prices it their own way.

01

Different baseline data

One contractor prices only the panels, another prices the panels and assembly, and a third prices a broader scope of work.

02

Different assumptions

If the project isn't defined, each party has to guess the house's shape, structure, quantities, and scope of work on their own.

03

Different configurations

One price may include elements that another doesn't.

04

Incomparable numbers

The lowest price doesn't necessarily mean the best deal — it may simply include less.

Situation B

With a prepared project

Everyone prices the same task.

01

One project

The manufacturer, builder, and engineer work from the same baseline data.

02

Clear quantities

Dimensions, the composition of elements, and the main quantities are determined by the project documentation.

03

A fixed scope

The proposal can clearly state exactly what's included in the estimate.

04

Comparable proposals

The client compares not just the final totals, but the cost of the same scope of work and configuration.

What should be compared isn't just the final total, but the same scope of work and configuration.

What needs to match for a fair comparison

01

Project

The same house: floor plan, dimensions, number of storeys, roof, and key structural decisions.

02

Configuration

An understanding of exactly what's included in the proposal: panels, additional elements, assembly, construction work, and other agreed items.

03

Scope of work

Each contractor should clearly state which part of the project they're responsible for and what's included in the price.

04

Baseline conditions

Region, logistics, timelines, site specifics, and other conditions that affect the estimate.

Eco-Bud Platform helps structure the process so that the project's baseline data is clear to every participant.

About budget — honestly

First, you need a ballpark figure. Then, an exact estimate.

At an early stage, it helps to know at least the possible scale of the budget. But the house's floor area alone doesn't give you an exact cost.

Illustrative example · a house of about 100 m²

≈ 30 000–60 000 €

A possible reference point depending on the architecture, configuration, materials, technical solutions, and agreed scope of work.

This approximate range is given to convey the scale of the budget and is not the price of a finished house. The scope of work, configuration, country of manufacture, delivery, and assembly are calculated separately for a specific project.

What you can already understand at the start

A fully finished project isn't needed for the first conversation. Even basic baseline data is enough to understand the scale of the task and define the next step.

01

Country and region

02

Approximate floor area

03

Number of storeys

04

Preferred architecture and house shape

05

Budget reference point

If you already have a floor plan, an architectural project, or materials about the site, they can be used as baseline data.

Have an idea for a house, or an already finished project?

Real projects

Not just the result. You can see the process itself.

Build Diary shows real Eco-Bud projects — from the earliest stages of construction to the finished house. Photos, work stages, and the project's history help show what the technology looks like not in a presentation, but on a real site.

Real project

Real process

Real result

See all real projects

Your situation

You don't have to start with a finished project.

Some already have a site and an architectural project. Others have only the idea of a future house. You can start with whatever you already have.

01

I have a site and a project

You can start by reviewing the project.

If you already have a suitable architectural project, it can be used as the starting basis. The next step is to review the decisions and determine what design documentation is needed for manufacturing and construction.

Prepare

The project and the basic data about the site.

02

I have a site but no project

First, let's define the future house.

The floor area, number of storeys, house shape, roof, layout, and your preferences become the baseline data for the concept design. Once the architecture is agreed, you can move on to the design documentation.

To start

It's enough to describe the site, the house you want, and your budget reference point.

03

I have an idea but no site yet

You can get to know the technology in advance.

Before buying a site, you can explore real Eco-Bud projects, understand the technology's specifics, estimate the approximate floor area, and shape your requirements for the future house.

Why this helps

This helps you choose the site and the architectural solution more deliberately.

04

I just want to understand whether Eco-Bud is right for me

Start with real examples.

Look at the technology, real projects, and answers to frequently asked questions. This way you can understand the system's principles before discussing a specific house.

Next

Once you have questions or an idea for a project, you can move on to a substantive conversation.

It doesn't matter what stage you're at right now. The first step is to understand your starting situation and identify the next necessary stage.

Next step

Tell us about the house you want to build.

You don't need a finished project. Describe your situation, your site, your idea for the house, and whatever you already know. We'll help you determine the next step that's right for your project.

You can start even with just an idea — the baseline data gets refined as the project develops.