About the project

Project

A-frame 5×7 m

Country

Montenegro

Region

Current stage

Area, m²

Floors

Project participants

Builder

Maine Inzenering

Manufacturer

About the builder

Maine Inzenering first encountered Eco-Bud technology in March 2023. The introduction was followed by consultations, negotiations, and a decision to collaborate, then the signing of a partnership agreement, training, and hands-on preparation of the team.

On 26 February 2025, the team began assembling its first trial house, a Barn 4×6 m, using Eco-Bud's assembly drawings — right in their own workshop. The house was first assembled in the workshop, then disassembled and moved to its permanent site. The next project was an A-frame 5×7 m guest house.

Today, Maine Inzenering's permanent crew consists of four people. Additional contracted specialists are brought in when needed.

The company's main area of operation is Montenegro. Work in nearby Balkan countries is also possible.

Timeline

Construction progress

Entries are published as work stages on the project are completed.

September 16, 2026

Assembling the timber base frame for the A-frame 5×7 house

Installing the timber base frame of the guest house.

Сборка каркаса нижней обвязки дома A-frame 5×7

September 17, 2026

Erecting the panel walls

Возведение стен из панелей

September 18, 2026

Installing roof panels

Монтаж кровельных панелей

September 22, 2026

Installing the roof over the terrace

Монтаж Кровли над Террасой

September 29, 2026

A striking roof view opens above the double-height space

Появляется красивый вид крыши из второго света

October 13, 2026

Preparing the Roof for Shingling and Finishing the Facade

Preparing the Roof for Shingling and Finishing the Facade