Build Diary

Barn 4×6 m

Barn 4×6 m

About the project

Project

Barn 4×6 m

Country

Montenegro

Region

Current stage

Area, m²

Floors

Project participants

Builder

Maine Inzenering

Manufacturer

About the builder

Maine Inzenering first encountered Eco-Bud technology in March 2023. The introduction was followed by consultations, negotiations, and a decision to collaborate, then the signing of a partnership agreement, training, and hands-on preparation of the team.

On 26 February 2025, the team began assembling its first trial house, a Barn 4×6 m, using Eco-Bud's assembly drawings — right in their own workshop. The house was first assembled in the workshop, then disassembled and moved to its permanent site. The next project was an A-frame 5×7 m guest house.

Today, Maine Inzenering's permanent crew consists of four people. Additional contracted specialists are brought in when needed.

The company's main area of operation is Montenegro. Work in nearby Balkan countries is also possible.

Timeline

Construction progress

Entries are published as work stages on the project are completed.

September 16, 2026

Assembling the Barn 4×6 test house in the production workshop

Сборка испытательного дома Barn 4×6 в производственном цеху.

September 17, 2026

Continuing assembly of the Barn 4×6 test house in the workshop

Тестовая сборка в цеху продолжается

September 18, 2026

Disassembled and loaded for the move to its permanent site

Разобрали, загрузили для переезда на постоянное место.

September 22, 2026

Wall assembly, sheathing and the start of roof work

Сборка стен, обшивка и начало кровельных работ

September 29, 2026

Roof sheathing

Обшивка крыши

October 13, 2026

Facade Cladding and Window Installation

Facade Cladding and Window Installation

Planning your own project?