ECO-BUD TECHNOLOGY

Not just a straw house. An engineered timber-and-panel system.

Eco-Bud is a system of factory-made straw panels in a timber frame. Element types and sizes are defined by the project; the prepared house kit is delivered to the site for sequential assembly, like a construction kit.

This project's walls — assembled in 3 days.

On this project, a team of 5 assembled the walls of a two-storey house from pre-made panels in 3 days.

This is the result for one specific project, not a standard construction timeline for all Eco-Bud houses.

View Build Diary
SYSTEM CHARACTERISTICS

Key Eco-Bud figures

Technical characteristics and data from real projects should be considered separately, depending on how each one is verified.

TESTED CHARACTERISTICS

R = 7.14

m²·K/W
Thermal resistance
for the tested 400 mm construction

λ = 0.056

W/(m·K)
Thermal conductivity

Rw = 54

dB
Sound insulation index
REAL PROJECT DATA

3

days
Wall assembly for this project

The result for one specific project with a pre-fabricated kit of panels. It is not a universal construction time for a finished house.

HOUSE KIT

A panel system for the building's main elements.

The composition of the house kit is defined by the specific project. Wall, roof, floor and special elements are manufactured according to construction documentation and prepared for sequential assembly on site.

Собранные стеновые панели с оконными проёмами: деревянный каркас и соломенное заполнение

Assembled wall panels with window openings before plastering: the timber frame, straw infill and element connection joints are visible.

Торцы панелей и стойки каркаса на возведённой стене

Panel edges and frame studs on an erected wall: the element thickness and infill density are visible.

Изготовление элементов в производственном цехе

Manufacturing elements in the production workshop: the assembly jig, timber and a stock of straw bales.

ELEMENT TYPES

01

Exterior walls

400 mm

Exterior wall panels: a timber frame with compressed straw infill. Panel dimensions and configuration are defined by the project.

02

Roof panels

400 mm

An insulated roof panel element. The application and geometry of roof elements are defined by the project's architectural and structural design.

03

Floor panels

200 mm

Used to form an insulated floor structure where this solution is specified by the project.

04

Interior walls

100 / 150 mm

The interior wall construction is chosen based on its function and the building's load-bearing scheme.

05

Intermediate floor slab

200 mm

Intermediate floor elements are used in accordance with the specific project's structural scheme.

06

Gable panels

400 mm

Elements for the building's gable end, for projects with a pitched roof geometry.

07

Opening elements

Header and sill

Specialised elements form the wall sections above and below openings, in line with the project's panel layout.

FIRE SAFETY

It is not straw alone that is tested, but the assembled structure.

How a wall or floor behaves in a fire depends on the whole structure: the timber frame, the density of the straw infill, protective layers, joints and finishes. The test results therefore apply to the specific samples tested, not to straw as a material in general.

01 · FIRE RESISTANCE

Shows how long the tested structure retains its required properties under standard fire exposure.

02 · FIRE SPREAD

Shows how a specific sample behaves in terms of fire spreading across the structure.

TESTED WALL

REI 60

Wall sample ПС 45.100.300

The tested wall sample achieved class REI 60. Over 62 minutes of standard fire exposure, no loss of integrity, insulation or load-bearing capacity was recorded.

The result applies only to the tested construction.

TESTED FLOOR SLAB

REI 45

Floor slab panel ПП 100.45.450

The tested floor sample, under a load of 200 kg/m², achieved class REI 45. Over 47 minutes of testing, no loss of the R, E or I criteria was recorded.

The result applies to the tested sample and the stated load.

SEPARATE TEST

M0

Fire spread limit — 0 cm

In a separate test of a specific floor panel sample, class M0 was established with a fire spread limit of 0 cm.

M0 does not mean that the panel or the straw is a non-combustible material.

The tested REI constructions used a timber frame, straw infill with a density of 120–140 kg/m³, and clay-sand plaster. On the fire-exposed side, the plaster layer was 25 mm thick.

ECO-BUD ARCHIVE

Воздействие открытого пламени на соломенное заполнение в деревянном каркасе

Fire exposure on a panel's straw infill

A frame from Eco-Bud's archive video: open flame acting directly on the straw infill inside the timber frame.

The REI 60 and REI 45 results shown above relate to separate standardised structural tests.

INDEPENDENT RESEARCH

Straw panel systems are studied by university research.

Research from the University of Bath shows that modern construction systems using compressed straw can be regarded as engineered structures whose properties are measured and verified experimentally.

Экспериментальное здание BaleHaus на территории University of Bath

BaleHaus · University of Bath · UK. An experimental building from a research project; it has no connection to Eco-Bud.

UNIVERSITY OF BATH · UK

BaleHaus — an experimental building for researching straw-panel construction

An experimental building called BaleHaus was built on the University of Bath campus, using the prefabricated ModCell panel system with straw infill.

The building served as a research site for studying how this type of construction behaves under real conditions.

ModCell is an independent British panel system developed by other companies. It is not an Eco-Bud technology, and BaleHaus is not an Eco-Bud building.

What was studied

01

Thermal performance

The heat transfer and thermal insulation properties of straw-filled constructions were studied.

02

Moisture behaviour

The behaviour of the construction under changing temperature and humidity was studied, along with the conditions for safe performance of the straw infill.

03

Air permeability

The airtightness of the building envelope was assessed, along with the effect of workmanship quality.

04

Acoustic performance

The behaviour of the multi-layer construction with respect to sound transmission was studied.

05

Structural behaviour

The behaviour of the panel system as a building structure was examined, rather than straw as a standalone material.

06

Long-term behaviour

Monitoring the experimental building made it possible to study the construction's performance under real operating conditions.

University of Bath's research measured the thermal conductivity of compressed straw samples at different densities. For a density of around 123 kg/m³, a value of approximately 0.064 W/(m·K) was published. This value relates to the infill material, not the finished construction, and depends on the sample's density, fibre orientation and moisture content.

This value relates to the samples studied and is not a characteristic of the Eco-Bud panel.

What this research confirms

University of Bath's work shows that modern compressed-straw constructions can be the subject of full engineering research: their thermal, moisture, acoustic and structural characteristics can be measured, modelled and verified.

What it does not confirm

This research was not conducted with Eco-Bud panels. The results from BaleHaus, ModCell or LILAC therefore cannot be used as Eco-Bud test results or certification.

Eco-Bud's characteristics must be confirmed by its own testing and by documentation for the specific construction.

For this reason, independent research on similar systems and Eco-Bud's own testing are shown separately on this page.

REAL-WORLD MONITORING

LILAC · Leeds

The ModCell system was used in the LILAC residential project in Leeds. University of Bath researchers monitored the in-use performance of the completed houses. The study covered 20 homes.

Source: University of Bath

University of Bath research →BaleHaus project — University of Bath →

Thermal conductivity measurements: Shea A., Wall K., Walker P. Evaluation of the thermal performance of an innovative prefabricated natural plant fibre building system. Building Services Engineering Research and Technology, 2013.

QUALITY CONTROL

Panel quality begins before installation.

During production, the properties of the straw, the timber and the geometry of the finished panel are all checked. This makes it possible to catch deviations in the factory — before the house kit is delivered to the building site.

≤ 18%

Straw moisture content

Before use, the straw is checked for moisture content. Raw material exceeding the set limit must not be used to make the panel.

Raw material check before pressing

100–130 kg/m³

Straw infill density

During pressing, the density of the straw infill inside the timber frame is controlled. The set range helps produce a consistent panel structure.

Pressing process control

≤ 18%

Timber moisture content

The frame timber is checked for moisture content before the panel is made. The material must meet the set production limit.

Timber frame check

2–3 mm

Geometry check

After fabrication, the panel's main dimensions and geometry are checked. Controlling deviations is essential for accurate fit between house-kit elements during installation.

Finished panel inspection

RAW MATERIAL → PRODUCTION → FINISHED PANEL

01

Raw material

Moisture check of straw and timber before the panel is made.

02

Production

Density check of the straw infill during fabrication.

03

Finished panel

Dimension and geometry check before the panel is added to the house kit.

RAW MATERIAL CHECK

Измерение влажности соломы игольчатым влагомером в рулоне

Measuring straw moisture with a needle moisture meter: the raw material is checked before the panel is made.

Why this matters on site

The more parameters are checked in the production facility, the less uncertainty is carried over to the building site. Panels arrive as pre-fabricated elements for the specific project, and on site the work consists of assembling and connecting them.

SYSTEM PROPERTIES

What the Eco-Bud panel system delivers

Eco-Bud's advantages come not from a single material, but from the combination of factory production, the timber frame, the straw infill, and panels designed as a single, unified house kit.

01

High thermal resistance

A thick layer of straw infill forms the building's thermal insulation envelope. For a 400 mm construction, this page states a value of R = 7.14 m²·K/W.

02

Sound insulation of the multi-layer wall

The combination of the frame, dense straw infill and finishing layers forms a multi-layer building envelope. For the tested construction, this page states an index of Rw = 54 dB.

03

More work is done in the factory

Panels are manufactured before delivery to the site. In production, the raw material, infill density and the geometry of finished elements can all be checked before installation begins.

04

Fast assembly of the finished kit

Pre-fabricated elements for the specific project arrive at the building site. This reduces the amount of work carried out directly on site and allows the construction to be assembled quickly from finished panels.

The actual time depends on the project, the kit configuration, the foundation, logistics and how the work is organised.

05

Lightweight panel construction

The timber frame and straw infill make it possible to create a building envelope without massive masonry. This affects logistics, installation and the building's load calculations.

06

Panels are designed for the specific house

The dimensions, panel types and required openings are determined by the design. A kit of elements prepared for the specific building configuration arrives on site.

07

A clear, legible wall construction

The system consists of physically distinct layers: the timber frame, the straw infill and the protective finish. The condition of the outer layers and connections can be monitored and maintained throughout the building's service life.

08

Renewable straw raw material

The main volume of the panel's thermal insulation infill is straw — a plant-based raw material that is a by-product of agriculture.

The environmental impact of the finished building depends not only on the straw, but also on the timber, the finishes, transport, building services, construction and operation.

FREQUENTLY ASKED QUESTIONS

Myths and Reality

❌ Myth

“A straw house burns easily”

✔ Reality

In a fire, the outcome is determined not by the straw alone, but by the entire wall construction. The tested Eco-Bud wall sample achieved class REI 60: during the 62-minute test, no loss of integrity, insulation capacity or load-bearing capacity was recorded. The result applies to the tested construction.

❌ Myth

“Straw in a wall will inevitably get damp and rot”

✔ Reality

Protection from excess moisture is critical for a straw construction. That is why the moisture content of the raw material is controlled, and the wall itself must be designed and built to limit water ingress and maintain a safe moisture regime in the construction.

Particular importance attaches to the exterior and interior finishes, protection from precipitation, the plinth, roof overhangs, junctions, window and door details, and the absence of prolonged leaks.

Durability depends on correct design, workmanship and maintenance of the construction.

❌ Myth

“Straw is too weak to build a house with”

✔ Reality

In the Eco-Bud system, load-bearing performance is provided by the panel's construction and its timber frame. The straw infill primarily performs a thermal insulation function.

The building's loads must be determined by the design and by engineering calculation, taking into account the specific house's layout, spans, openings, floors, roof and local loads.

For this reason, the strength of a house cannot be assessed solely by the strength of straw as a standalone material.

❌ Myth

“Mice will inevitably get into straw walls”

✔ Reality

The risk of rodents is determined primarily by access into the construction, not by the presence of straw itself.

In a correctly built wall, the straw infill is enclosed by finishing and protective layers, and potential entry points must be sealed at the plinth, roof, opening, service-penetration and other junction details.

Protection from rodents is a matter of detail design and the quality of the construction's execution.

FROM DESIGN TO INSTALLATION

How a design becomes a house kit

Eco-Bud does not begin on the building site. Panels are designed for the specific house, manufactured in advance, assembled into a kit, and only then delivered to the site for installation.

01

Design

The house configuration is translated into a system of specific panels and connection details. The types and dimensions of the elements, the openings, the joints and other parameters needed to manufacture the house kit are determined.

The load-bearing scheme and loads must be determined by the design and engineering calculation.

02

Panel production

Based on the design documentation, the timber frame elements are made, the straw infill is formed, and panels of the required types and sizes are assembled.

Production checks are carried out before the finished elements are handed over to the house kit.

03

Assembling the house kit

The finished elements are matched to the specific project and prepared for sequential installation at the building site.

Elements are prepared and identified for installation in accordance with the design documentation.

04

Delivery

The prepared kit of panels is delivered to the building site in line with the sequence of the subsequent installation.

The transport plan depends on the size and number of elements, distance, route and the conditions of the specific project.

05

Installation and protection of the construction

On the prepared base, the panels are installed and connected in accordance with the design and installation documentation.

After assembly, the construction must be protected from moisture and prepared for the next stages of construction and finishing.

The duration of installation depends on the project, the number of elements, how prepared the base is, the crew's composition, logistics and site conditions.

Clay plaster can be used as one of the compatible finishing options for the corresponding wall construction.

Installing the panels is not the end of building the house

Assembling the house kit forms the panel construction provided for by the design. The foundation, roofing work, windows and doors, building services, protective and finishing layers, and other work depend on the kit configuration and the specific project.

For this reason, panel installation time cannot be used directly as the construction time for a fully finished house.

CONSTRUCTION PRINCIPLE

How a panel system differs from building a wall on site

The difference does not start with the question of which material is “better”. The main difference is where and when the wall construction is formed. In a panel system, a significant part of this work moves from the building site to the production facility.

This is a comparison of processes, not of every characteristic of specific construction technologies.

STAGE

ECO-BUD PANEL SYSTEM

WALL BUILT ON THE SITE

01 · DESIGN

ECO-BUD

Panels are determined by the design in advance

The types, dimensions, openings and layout of the elements are determined by the design before the house kit is manufactured.

BUILDING SITE

Some decisions are made directly on site

The wall is formed on site from individual materials and elements in accordance with the design and the construction method used.

02 · FABRICATION

ECO-BUD

The wall's main elements are made in the factory

The frame, straw infill and panel geometry are formed before delivery to the building site.

BUILDING SITE

The wall construction is formed on site

Materials are delivered to the site, and a significant part of the operations that create the wall are carried out directly during construction.

03 · QUALITY CONTROL

ECO-BUD

Some parameters are checked before delivery

The raw material, the density of the straw infill and the panel geometry are checked during manufacturing.

BUILDING SITE

Checks accompany the sequential work on site

Quality depends on adherence to the design, the construction method and checks at every stage carried out directly during construction.

04 · LOGISTICS

ECO-BUD

A kit of elements arrives on site

The panels for the specific project are manufactured in advance, after which the kit is delivered to the construction site.

BUILDING SITE

Materials arrive according to the construction stages

Different materials and elements are delivered in line with the sequence of work carried out on site.

05 · INSTALLATION

ECO-BUD

Pre-fabricated elements are assembled on site

The main task of the installation stage is to set the panels in place and connect them in accordance with the design.

The actual duration depends on the specific project and construction conditions.

BUILDING SITE

The wall is built up sequentially on site

Forming the wall construction is part of the construction process carried out directly on site.

06 · RESULT

ECO-BUD

The house kit links the design and the production

The manufactured panels are elements of the specific project and are handed over for installation as a single kit.

BUILDING SITE

The design is realised through a sequence of construction operations

The finished construction is formed on site as the work provided for by the design is carried out.

The main difference is moving part of the construction process into production

Eco-Bud does not eliminate design, engineering calculations or skilled installation. A panel system changes the sequence of the work: a significant part of the wall construction is prepared before the house kit arrives at the building site.

The cost, timeline and characteristics of the finished house still depend on the project, the country, the foundation, building services, finishes, logistics and how the construction is organised.

DURABILITY

Properly protected, straw can last for generations.

The durability of a straw wall is determined not by the age of the straw as a material, but by how well the construction is protected from prolonged moisture and how correctly its details and protective layers are executed.

Maison Feuillette в Монтаржи: сравнение снимков 1920 и 2013 годов

Maison Feuillette · Montargis, France · 1920

HISTORICAL EXAMPLE

1920

Maison Feuillette · Montargis, France

Maison Feuillette · Montargis, France

Maison Feuillette was built in 1920 by the engineer Émile Feuillette. The construction uses a timber frame with straw infill.

The French professional network RFCP calls it the oldest known building of this type. The house has survived for more than a century and is now part of the Centre National de la Construction Paille.

According to CNCP materials, by the building's centenary the straw insulation remained intact.

Source of historical data: RFCP / Centre National de la Construction Paille

Maison Feuillette is not an Eco-Bud building.

This example does not establish a service life for Eco-Bud panels and is not a guarantee of their durability. It shows something else: straw inside a correctly designed and protected building construction can be preserved for a very long time.

The main factor is moisture control

What is dangerous for straw is not age itself, but prolonged excess moisture. The durability of a wall therefore depends on how well the construction resists water ingress and avoids long-term moisture accumulation.

01

Dry raw material

The moisture content of materials is checked before the panel is made. Damp raw material must not be enclosed inside the construction.

02

Protection from precipitation

The roof, overhangs, façade layers, plinth and other elements of the building must limit direct water ingress into the wall construction.

03

Correctly built details

Particular attention is needed at junctions, window and door openings, service penetrations and other places where a flaw in the detailing can let moisture in.

04

Operation and maintenance

The condition of the roof, façade, drainage, sealing and other protective elements must be monitored throughout the building's operation.

What this means for Eco-Bud

In Eco-Bud, the straw sits inside the panel construction and must be regarded as part of the whole wall system. Durability depends not only on the quality of the manufactured panel, but also on the building's design, the installation, protection of the construction, the finishes and its subsequent operation.

It is therefore more accurate to speak not of a single universal number of years, but of the conditions that allow the construction to keep its properties over a long period.

Source: RFCP — Réseau Français de la Construction Paille

ECO-BUD IN PRACTICE

From panel production to a real house.

Eco-Bud is not a concept or a rendering. Below are real materials from sites and production facilities connected to the technology.

Готовые соломенные панели в производственном помещении

02

Panel production

Poland

Finished panels in timber frames with straw infill and an applied plaster layer, ready for shipping.

Сборка деревянного каркаса с соломенным заполнением в производственном цехе

03

Production and assembly

Montenegro

Assembly of the construction in the factory: a timber frame with a rafter system, filled with compressed straw, with the openings left in place.

This page uses real photographs of sites and production processes. The system's technical characteristics are confirmed separately — through testing and documentation for specific constructions.

START YOUR PROJECT

Discuss your project with Eco-Bud.

Tell us where you're planning to build and what you already have: an idea, a sketch or a finished design. We'll help you figure out the right next step for your situation.

Discuss your projectFAQ