The documentation used to manufacture panels and assemble the house

Engineering Eco-Bud turns the approved architectural design into structural documentation for the panel system. The manufacturer receives the data needed to produce the panels, and the assembly team receives the assembly drawings and panel layout.

Демонстрационный дом Eco-Bud площадью 100 м²

SCOPE OF SERVICE

The engineering link between architecture and production

Once the house's look and layout are settled, one engineering question remains: exactly which elements will it be built from. That's precisely what Engineering Eco-Bud answers — breaking the building down into panels, defining their types, dimensions and connection details, and issuing the documentation used to manufacture and install them.

Engineering Eco-Bud does not replace

  • 01

    the architect's work or the development of the architectural design

  • 02

    building permits and local approvals

  • 03

    the involvement of a local licensed architect or engineer where required by law

  • 04

    geological and geotechnical site surveys

THREE DOCUMENTS

What CD, AP and SD are — and in what order they happen

A “house project” isn't a single document. Behind that word are three separate pieces of work, each with a different author.

01

CD

02

Eco-Bud SD

03

Manufacturing

04

Assembly

AP · local architect

can be prepared before or after the SD

CD

Concept Design

Defines the layout, dimensions, number of storeys, main openings and shape of the building. It's developed by an architect or designer — Engineering Eco-Bud does not carry out this stage. The layout, dimensions and key architectural decisions must be agreed before structural documentation development begins.

SD

Eco-Bud Structural Documentation

Begins once the architecture is defined to the necessary degree. Translates the building into the panel system: element types, dimensions, panel layout, connection details and specifications.

AP

Architectural Project

Carried out by a local architect or architectural firm and used for local permitting procedures. The AP can be developed either before or after the SD. In practice, the local architect often prepares it based on the final dimensions, geometry and structural decisions already defined in the Eco-Bud SD.

WHAT'S IN THE SD

From the overall house scheme to production-ready data

The core Engineering Eco-Bud package connects two sites: panel manufacturing and house assembly. That's why the documentation is split by who uses it and for what work.

CORE PACKAGE

B

Assembly documentation

Plans and axes, wall-by-wall panel layout, connection details and overall assembly documentation.

For the assembly team

C

Panel manufacturing documentation

Detailed element drawings, dimensions and data the manufacturer needs to produce the panels for this specific house.

For the manufacturer

BY SEPARATE ARRANGEMENT

A

Foundation

Usually a local engineer

The foundation is not part of the core Engineering Eco-Bud package. In roughly 95% of cases it's designed by a local engineer, who knows the local soil conditions and building regulations and carries the corresponding professional responsibility.

In certain cases, Eco-Bud can develop a foundation solution — for example, for ground screws.

DOCUMENTATION EXAMPLE

One house — from architecture to production

Using a single Eco-Bud demo house, we show the whole path: from the approved architecture to the structural documentation used to manufacture the panels and assemble the house on site.

All the materials below refer to one 100 m² house.

01

House architecture

The starting house: architecture, dimensions and openings defined

Демонстрационный дом Eco-Bud площадью 100 м²: архитектура, габариты и проёмы

02

3D structure

The building assembled from structural elements

03

The complete structural documentation package

13 sheets from the Eco-Bud 100 m² demo project. You can browse through the full set and open any sheet full-size.

DIVISION OF WORK

What the engineer calculates, and what each team receives

01

Eco-Bud engineer

Work

The building's structural scheme, panel layout, element types and dimensions, connection details and specifications. Decisions account for the construction location and applicable regulatory requirements, including the relevant design loads.

02

Client

Result

The SD package in PDF and a 3D video model of the house. A clear understanding of exactly what will be manufactured and assembled.

03

Manufacturer

Result

The documentation needed to manufacture the panels: element detailing and material specifications.

04

Assembly team

Result

Assembly documentation: the overall panel layout and the SD the team uses to assemble the structure.

BASELINE DATA

An approved sketch is enough

Ideally, you already have a finished architectural project or an approved concept design. A formal AP isn't required: work can begin based on an agreed sketch, as long as the house's architecture is defined in sufficient detail.

It helps to share everything you already have on the project:

  • 01

    Dimensions, plans, elevations, sections

  • 02

    Information about the site and construction location

  • 03

    The intended foundation type

  • 04

    Any known engineering or structural constraints

  • 05

    Any other available design information

The more complete the baseline data, the fewer assumptions need to be made at the start.

PROCESS

How the work proceeds

01

Initial contact and baseline data

Understanding the task and the materials provided

02

Baseline data review

Dimensions, storey count, layout and main openings are confirmed as the baseline for SD development

03

Architecture locked in

This is the lock-in point. Changes after this are treated as separate work

04

Structural design

The building scheme, layout approach and element types

05

SD development

Assembly drawings and panel drawings

06

Handover

The SD package in PDF, 3D video models

07

Support

Support for manufacturing and assembly

CHANGES TO BASELINE DECISIONS

The layout, dimensions and key architectural decisions must be agreed before SD development begins. Changes to baseline decisions after SD development has started are possible, but are treated as additional work and charged separately.

DELIVERABLE

A package that keeps working

Once development is complete, the client receives the structural documentation package and a visual representation of the house's structural model.

The assembly team works from the overall panel layout and the SD.

RESPONSIBILITY

Who is responsible for what

Area

Who's responsible

Structural design of the panel system

Engineering Eco-Bud

Documentation for panel manufacturing

Engineering Eco-Bud

Assembly documentation

Engineering Eco-Bud

Architectural project and permitting procedures

Local architect or firm

Foundation

Usually a local engineer. An Eco-Bud solution is possible in certain cases, by arrangement

Soil conditions, geology, geotechnics

Local specialists

Signature, review or approval required by law

Local licensed architect or engineer

Panel manufacturing

The manufacturer, with Eco-Bud support

Structural assembly

The construction team, with Eco-Bud support

ONGOING SUPPORT

Documentation delivered. The engineer stays on call.

Engineering Eco-Bud's work doesn't end when the SD package is delivered. Questions about structural decisions and documentation can come up while the panels are manufactured and the house is assembled. Eco-Bud supports both the manufacturer and the assembly team.

01

Manufacturing

Support for the panel manufacturer

The manufacturer works from the documentation for this specific house. If questions come up during production about drawings, dimensions, elements or structural decisions, Eco-Bud helps clarify the documentation and correctly implement the intended solution.

SD → PANEL MANUFACTURING

02

Assembly

Support for the construction team

The assembly team receives the overall panel layout and the structural documentation. If questions come up during assembly about element placement, connections or the intended structural decisions, Eco-Bud supports the team through the project documentation.

SD → HOUSE ASSEMBLY

COST AND NEXT STEP

Let's start with your house

Engineering cost

from €4 / m²

This is the starting cost for developing Eco-Bud structural documentation. The final price depends on the size of the house, the complexity of the structural design and the scope of work required.

Engineering foundation

2002

Engineering and construction practice

2012

Development of Eco-Bud technology

Engineering Eco-Bud is built on hands-on experience in design, construction and the development of our own panel system.

Have a sketch or an architectural project?

Send us what you have — we'll see whether it's enough to start SD development and how much Engineering work your house will need.